Robinson_09051867__0459

OverviewTranscribeVersionsHelp

Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

6 revisions
California State Library at Jun 04, 2020 09:49 PM

Robinson_09051867__0459

11 — For Culvert Masonry and Foundation for
Trestle Work (dry) per cubic yard, Class 4 15.

12 — For Slope or Retaining Wall, including paving
for foundations of structures (dry)
per cubic yard, Class 5 8.

13 — For Brick Work in Cement, per thousand, Class 6 27.

14 — For Blind or French Drains (dry) per cubic yard, Class 7 2.50

15 — For Cement mortar, per cubic yard 7.

16 — For Lime Mortar, per cubic yard 4.50

17 — For Timber in Truss Bridges of spans from 149
to 201 feet, per M feet, B. M.

18 — For Timber in Truss Bridges of spans from 99
to 151 feet, per M feet, B. M.

19 — For Timber in Truss Bridges of spans from 49
to 101 feet, per M feet, B. M.

20 — For Timber in Truss Bridges of spans from 14
to 51 feet, including all Farm and Road
Bridges, per M feet, B. M. 60

21 — For Timber in Stringer Bridges, Trestling and
Timber Piers, per M feet, B. M. 60.

22 — For Timber and Plank in Foundations,
per M feet, B. M. 45.

23 — For Timber in Piling, per M feet, B. M.

24 — For Driving the same, per linear foot under
surface, per linear foot

25 — For Wrought Iron in all structures per pound .12

26 — For Cast Iron in all structures per pound .7

27 — For Spikes and Nails in all structures per pound .7

[bottom left margin:] 15
33

Robinson_09051867__0459

11 — For Culvert Masonry and Foundation for
Trestle Work (dry) per cubic yard, Class 4 15.

12 — For Slope or Retaining Wall, including paving
for foundations of structures (dry)
per cubic yard, Class 5 8.

13 — For Brick Work in Cement, per thousand, Class 6 27.

14 — For Blind or French Drains (dry) per cubic yard, Class 7 2.50

15 — For Cement mortar, per cubic yard 7.

16 — For Lime Mortar, per cubic yard 4.50

17 — For Timber in Truss Bridges of spans from 149
to 201 feet, per M feet, B. M.

18 — For Timber in Truss Bridges of spans from 99
to 151 feet, per M feet, B. M.

19 — For Timber in Truss Bridges of spans from 49
to 101 feet, per M feet, B. M.

20 — For Timber in Truss Bridges of spans from 14
to 51 feet, including all Farm and Road
Bridges, per M feet, B. M. 60

21 — For Timber in Stringer Bridges, Trestling and
Timber Piers, per M feet, B. M. 60.

22 — For Timber and Plank in Foundations,
per M feet, B. M. 45.

23 — For Timber in Piling, per M feet, B. M.

24 — For Driving the same, per linear foot under
surface, per linear foot

25 — For Wrought Iron in all structures per pound .12

26 — For Cast Iron in all structures per pound .7

27 — For Spikes and Nails in all structures per pound .7

[bottom left margin:] 15
33