CB05_0673
Facsimile
Transcription
Status: Needs Review
673
Aug 3 [187]8
Mrs. Cath.^ne^ F Scott
97 Highland St Chelsea
Dear Madam
The recent
high winds have so loosened
a headstone in lot 1323
that in order to save its falling
we lifted [it out of the socket?]
The stone was never
properly placed in the base
To securely repair it
will cost $4.00
Very Respectfully
J.W. Lovering Sup.^t^
per Childs
Aug 3 [187]8
Miss S A Burk
125 Saratoga St. E.B.
Dear Madam
The cost of
making the removal from
[St?] Johns Lot grave [95?]
of remains of J.A. Burk Int.
July 18 1852 and the boxing
of the stone will be
$10^00^ labor paid at the
time the work begins
Very Respectfully
J W Lovering Sup^t^
per Childs
Notes and Questions
Nobody has written a note for this page yet
Please sign in to write a note for this page