1871-1900 Yaquina Head Lighthouse Letter books

OverviewStatisticsSubjectsWorks List

Pages That Mention Engineer

Vol 631 Tramway Winch LH Reports 1884 and 1885

17
Indexed

17

Office of the Light House Engineer Thirteenth District Portland, Oregon Sept 6th 1884

To the Chairman of the Light-House Board Washington, DC

Sir: In compliance with the Board’s request in letter of 26th ult., relative to means for hoisting supplies form beach at Cape Foulweather Lt. Sta., I have the honor to report that a detailed estimate for such an apparatus was included in the estimates for the current half year. The estimate was approved by the Board’s letter of Aug. 9th, 1884. The plan is to erect an inclined tramway with winch and car on the south west side of the Cape, about 1000 ft. from the

Last edit about 7 years ago by Wjhoward
19
Indexed

19

Office of the Light House Engineer Thirteenth District Portland, Oregon Aug 14 June 30th 1885

To the Chairman of the Light House Board Washington, D.C. Sir: I have the honor to submit the following annual report to June 30, 1885 of engineer operations in the 13th L. H. District. This district extends form the southern boundary of Oregon to the boundary between the United States and British Columbia, and embraces all aids to navigation on the Pacific coast of Oregon and Washington Territory and in the Columbia and Willamette Rivers, Straits of Fuca and Puget Sound. In the district there are: Light-Houses 16

Last edit about 7 years ago by Wjhoward

Vol 348 Engineer Reports 13th Dist. 1873 and 1874 CF Exhibted YB Discontinued

2
Indexed

2

Office of the Light House Engineer Thirteenth District Portland, Oregon July 24, 187 SIR: The following Telegram was sent this day Foulweather Light will be exhibited, If approved, August twentieth ~~~~~~~~~~~~~~~~

Last edit about 7 years ago by Wjhoward
3
Indexed

3

Office of the Light House Engineer Thirteenth District Portland, Oregon July 26, 1873 Sir: I have the honor to make the following Report of Operations for the Month of June, 1873. Yaqunia Bay LH Ogn. Examined land with reference to 20 acres being sufficient for LH purposes. Cape Foulweather Lt Station Ogn. Shipped missing parts of Lantern from San Francisco. Sodded yard where wind was tearing away soil. Made arrangements for re-whitewashing tower. Probable Operations in July. Rewhitewashed Tower. Begin the erection of the Lantern. Point Adams Lt Station, Ogn. In company with Capt. Spotts LH Inspector, selected LH Site. Carefully examined different roads from Steamer landing as Fort Stevens, to proposed LH Site, and made rough plan & estimate for Road over the best route. Advertised for Proposals for Fog Signal Boilers for this station and New Dungeness LH Station, W.T. Cape Flattery Lt. Ho. W.T. Took men and materials to this station and area by completed carpenter work on Tank for Water. Commenced caulking tank. Probable Operations for July. Complete Tank and fill with water from cistern. Repair fog signal and put into operation. Stay rotten joists in Lt. House Very respectfully, Henry M Roberts Chairman Light-H0use Board. Maj. Of Eng’rs & L.H. Eng’r Washingotn DC Thirteenth District

Last edit about 7 years ago by Wjhoward
4
Indexed

4

Office of the Light House Engineer Thirteenth District Portland, Oregon, August 13, 1873 Sir: I have the honor to make the following Report of Operations for the month of July 1873 Yaquina Lt Station Ogn. Made a survey of 20 acres to be retained permanently for Light House purposes. Cape Foulweather Lt. Station, Ogn Completed Lantern, except soldering roof. Repaired Road from Lt House to Newport, building 2 small bridges with old lumber from the LH Side. Repainted part of the iron of tower.

Probable Operations for August. Lens to be put up and Lamp to be put into operation. Lantern roof to solder. Lantern to be painted inside and outside. Tower and fences to have an additional coat of whitewash. Lightning rods to be made and put up. Cape Flattery LH Station, W.T. Finished planking and caulking tank. Pitched Tank, and boarded is on the outside and top to protect from the sun. Pumped 20 000 gallons into tank, leaving over 8000 gallons is cistern. Put bad-moulding under cornice in Signal house to protect Engine from rain and snow-made another door between engine room and fuel room. Repaired fiction band on Engine.

Last edit about 7 years ago by Wjhoward
Displaying pages 6 - 10 of 141 in total