1871-1900 Yaquina Head Lighthouse Letter books

OverviewStatisticsSubjectsWorks List

Pages That Mention Keeper

YH LH location and building Vol. 311

72
Indexed

72

In tower, Carpenter's and Laborer's work to be completed -

Brick walk to be laid from rear gate to house and soil placed on surface of garden.

Cape Hancock Light Station. Wash Ty.

Completed new house and frame for fog bell in place of those destroyed by the blast of the 15" gun - Dimensions as follows. House 10 feet square by 8 feet high. Balloon frame weather boarded, painted white. Bell frame is 8 1/2 feet high from the floor and made of 10 in square timber.

In the Light House the plate glass that was broken has been replaced.

Per contract with C.F. Brown dated June 19, 1871, the new dwelling for light keeper is in course of construction, the brickwork being completed and frame up.

311

Last edit about 5 years ago by dougreade

1898 Keeper Harry Littlefield Vol. 1245

2
Indexed

2

Light-House Establishment, Office of the Light-House Inspector, Thirteenth District Inclosures. Portland, Oregon, 20 September, 1898.

Subject:

The Light-House Board, Washington, D. C.

Sirs:

Referring to the Board's letter of the 15th. instant regarding the statement in the case of the Second Assistant Keeper Harry S. Littlefield of Yaquina Head Light Station.

I have to state that the Keeper informed me at the time of my inspection of that Station that Littlefield was physically unable to perform his duties. Littlefield told me that the Keeper's statement was true, that he found it difficult to perform his duties, and that he wished to resign.

His resignation was forwarded to the Board on the 18 August, '98, the acceptance of which I recommended.

Respectfully,

signature???

Commander, U. S. N., Light-house Inspector.

Last edit about 7 years ago by Wjhoward

1871-1872 keeper selection and LH building Vol. 336

4
Indexed

4

Office of Light-House Inspector Twelfth District, San Francisco, Cal., Feb 6th, 1873

Professor Joseph Henry Chairman L.H.Board Washington, D.C. Sir, In obedience to instructions, letter Jany. 4th 1873, will leave him??? tomorrow, for Astoria Oregon to meet the Supt. and Engineer of 13th Dist. to examine candidates for Keeper and assistant Keeper for Cape Foulweather Lt. Station and also examine the assistant Keeper in the Astoria Superintendencey deemed worthy of promotion as Keeper, and attend to such other business as may be brought before the local Board.

Very respectfully,

Last edit over 6 years ago by lkarnatz
6
Indexed

6

Office of Light-House Inspector, Twelfth District, San Francisco, Cal., Feb 21st, 1873

Professor Joseph Henry Chairman L.H. Board Washington, D.C. Sir, In obedience to your order of Jany. 4th 1873, the Board for the examination of such persons as might be brought before it for Keepers and assistant Keeper, was convened at Astoria, Oregon, Feby., 10th, 1873, and examined and found qualified the only two persons present, for assistant Keeper at Cape Foulweather. The assistant Keeper in the Astoria Su perintency were duly notified, but failed to appear, on account, as I understand, of the uncertainty of getting the position of Keeper, they were not willing to incur the necessary

Last edit over 6 years ago by lkarnatz
12
Indexed

12

THIRTEENTH DISTRICT

Portland, Oregon, July 9, 1872

Chairman Light House Board,

Washington, D.C.

SIR:

I have to submit the following Report of Operations for June: Cape Foulweather Lt. Station, Oregon. Shipped metal work to San Francisco, as no vessel could be chartered from Portland to Foulweather except at exorbitant rates. Shipped stone work & miscellaneous freight from San Fran- to the Cape; also all the L.H. materials (per??? schooner) from Newport to the Cape. Completed grading about L.H. Site, and collection of sand. Continued work on Tower foundation. Transported all materials at top of Tramway to L.H. Site. Probable Operations for July. Transportation of materials from San Francisco. Continue work on Tower. Commence work on Light Keeper’s Dwelling. Cape Flattery Lt. Station, Wash. Ter. Completed & painted wood & engine house, & cistern. Delivered 25 tons coal from Neah Bay, in Wood House. Made drawings of completed work. Inspected Lt. Station. Left Fog Signal in charge of Keeper and one assistant, who did not wish further instruction in its management. Cistern has no water, and the Whistle can not be regularly blown (except for practice) early??? winter, without great expense. Will transmit at an early day, in-

Last edit over 6 years ago by lkarnatz
Displaying pages 11 - 15 of 53 in total