Office of the Light House Engineer Thirteenth District Portland, Oregon, Sept 9, 1873

SIR: I have the honor to make the following Report of Operations for the month of August 1873. Cape Foulweather Lt Station, Ogn Completed work on Lt-House & lantern, instructed keepers to exhibited the light for the first time on the night of August 20”. New Dungenness Lt Station, W.T. Completed detail plans and estimates of fog signal house. Purchased materials and sent men in charge of Supt of repairs, to erect fog whistle. Make contract for boiler for Fog Signal. Probable Operations for September Commence building house and cistern. Complete transportation and hauling of material. Admiralty Head Lt Station, W.T. Probable operations for September. Commence painting dwelling. Columbia River LH Station, Ogn Begin building Road in September, if plan forwarded is approved by Light House Board. Point no Point LH Station, W.T. Begin in September building road and clearing land of heavy timber, if Report of April 30th is approved by the Light-house Board. Very Respectfully, Chairman Light-House Board, Henry M Robert Washington DC Maj of Eng’rs & L.H. Eng’r

Last edit about 7 years ago by Wjhoward

1871-1872 keeper selection and LH building Vol. 336

50
Indexed

50

Ediz Hook Lt Station, W.S.

Thoroughly completed zinc parapet covering. Examined Keeper & Assistant in company with Capt. Spotts.

New Dungeness Lt. Station, W.S. Purchased and shipped materials for completion of repairs. Put floor in Boat House & battens on sides. Finished door, & furnished paddock for same. Connected work-house with cistern by covered pipe. Put coat paint on Boat House & 2 coats on inside of Store Room. Inspected work of Repairs, & examined Keeper & Assistant with Capt. Spotts.

Probable Operations for April Put eave-troughs (galvanized iron) in place of defective ones on Store Room. Refit pump in Cistern. Put 2" coat paint on Boat-House; 1 coat paint on inside & outside of store-room. Put stakes to fence. Build 60 ft of new ways for Boat. Repair Boat Carriage. Connect Storeroom with Cisterns. Paint Roofs of Storeroom & Boat House.

Examined Keepers & Assistants at Admiralty Head & Smiths Island Lt. Houses, with Capt. Spotts.

Very respectfully, Your obedient servant, Henry M. Roberts Maj. of Eng'rs & L.H. Eng'r, Thirteenth District.