61
Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.
2 revisions | Koliver at Feb 11, 2024 10:39 PM | |
---|---|---|
61DETAIL SPECIFICATIONS. THE REQUIREMENT. It is required that there be constructed in accordance This pavement to extend from curb to curb as same may be EXCAVATION. Shall be included in the price of bid on per square The contractor shall dispose of all excavated material as For distance greater than 3000 feet an over haul allowance In the prosectuion of the work the contractor will be held MARGINAL CURB. Whenever the pavement is joined to maedam, gravel or | 61 |