Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.
3 revisions | Koliver at Feb 16, 2024 01:24 AM | |
---|---|---|
62-2- be set to accurately fit the curviture of the cross section of the CONCRETE FOUNDATION. Upon the prepared sub-base shall be placed and thoroughly This concrete shall be composed of one (1) part Portland Separation of sand and gravel and recombination, will not A barrel of Portland Cement will be considered as four The approved pit gravel shall be measured in bottomless The work of measuring and mixing shall be done on a plat- The concrete shall be mixed at least four times. Two times After the mass has been mixed dry, water in sufficient After the concrete has been properly made it shall be This concrete shall be allowed to set at least 4 days. | 62-2- be set to accurately fit the curviture of the cross section of the CONCRETE FOUNDATION. Upon the prepared sub-base shall be placed and thoroughly This concrete shall be composed of one (1) part Portland Separation of sand and gravel and recombination, will not A barrel of Portland Cement will be considered as four The approved pit gravel shall be measured in bottomless The work of measuring and mixing shall be done on a plat- The concrete shall be mixed at least four times. Two times After the mass has been mixed dry, water in sufficient After the concrete has been properly made it shall be This concrete shall be allowed to set at least 4 days. |