Harry O. Bates Esq.
New York

Dear Sir,

In regard to the order
left June 26th. The grading and
sodding can be much better done
if left until early fall. The
charge for resodding you will
remember was to be $30- and the
old material. As the old material
(fence) is not to be removed the charge
will be $40.

Very Respectfully,
J.W. Lovering
pr J.C.S.
Supt

Mrs. Eliza Eddy
Boston

Dear Madam,

In answer to your
inquiries as to removal etc. You will
be allowed $10 for the grave in St. John
lot when vacated. The expense
of moving the bodies to the new lot includ-
ing a new box will be $13, and for
a new foundation $4.40. The stone-
cutter will probably charge you
$3 to cut down the headstone.

Very Respectfully,
J.W Lovering
pr J.C.S.
Supt