Superintendents Report
for December 1892
To the Honorable the Board of
Park Commissioners
Gentleman
The work of the department during
the past month was as follows.
This Park is being topographically
surveyed including the adjoining avenues
ready for the finished plans to be made.
The ground around the rustic parachute
is being prepared and shaped with
its flower beds made ready for the
permanent and transient planting next
Spring. Other large beds have been
added and made ready, having
required 21 loads of cow manure,
11 loads of leaf mould, & 11 loads of clay.
The walks of this park are not yet
sufficiently graveled and are being
thus supplied; 56 loads havingnow
been used.
This ground was surveyed and its
topography is being plotted ready
for making the plans for its improvement