2

OverviewTranscribeVersionsHelp

Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

3 revisions
StephanieJoWebb at Mar 13, 2020 04:48 PM

2

MR. PRESIDENT:

Your Committee on Streets
to whom was referred the Petition of M.H. Young
et al would report recom-
mending that a bridge on road-
way 16 feet wide, and about 600
feet long, on bents, be divided
to be constructed, and that the
necessary box drains be
also put into position on said
street. The work is estimated
to cost about $700 for the bridge.

Report adopted

Frank Hanford Chairman.
C. B. Bagley Committee.

2

MR. PRESIDENT:

Your Committee on Streets
to whom was referred the Petition of M.H. Young
et al would report recom-
mending that a bridge on road-
way 16 feet wide, and about 600
feet long, on bents, be divided
to be constructed, and that the
necessary box drains be
also put into position on said
street. The work is estimated
to cost about $700 for the bridge.

Report adopted

Frank Hanford Chairman.
C. B. Bagley Committee.