Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

2 revisions
awhtou at May 15, 2020 08:37 PM

504

Autumn Quarter 1954

House Improvements

1. Two forced-air furnaces installed One in
the attic to heat the 2nd and 3rd floors
and one under the house to heat the
first floor. Installed by the C. [Alleberry?]
Co. at a cost of ----.

2. Installation of complete new electrical
circuits for floor plugs for all rooms,
wiring for furnaces and a new [service?].
The house now uses two 110 volt feeders rather
than a single 110 volt line. Work by F. [Daughtey?] -
$815.

3. Lead pipes under both first floor
toilets had to be replaed.
Work by C. [Alberry?] - cost - $57.70

4. Rain gutter in back of the House repaired by C. [Albery?]
Co - Cost -

5. Purchased a new Electrolux vacuum cleaner
at a cost of $90

6. Front Hall painted by Luke Chan, Don Cheu,
Don Tsang and Francis Wong - 10/22/54

7. Living room rug washed by Marty Lee and
Don Tsang. 10/1/54

8. Ping pong room, library, hall and living
room floors washed and waxed by Don
Cheu, Marty Lee, Young Lee, and Don
Tsang. 10/1/54

9. All drapes and curtains removed for
cleaning. 10/1/54