Commencing from the sill or level
of the upper flooring of the Rajbuha
Head.-

7 " The Banks, beams, and Slopes,
will be made regularly and neatly
as is done on the main Channel.
8 " The Bank on the Sumy or East=
=ern side will be considered the
line of "gusht (patrol) or road
bank.
9 " The Channel, beams, and road
bank will be kept clear from
gross and jungle always.--
10 " The best depth in soil" for
Rajbuha Excavation is considered
to be 3 feet, by which depth, surface
irrigation, and the repairs of the
Channel appear to be most easily
managed. Varieties in depth
of excavation, however, cannot
be avoided, although in laying
out the slope of bed, and in
determining the position of
masonry descents, Executive Officer
must be guided by the above
approved depth, and by the
well understood inconvenience
of shallow excavation and the
consequent necessity under such
circumstances of Bank raising.

An inspection by Exective 2 by Executive
officers of the Eastern Jumna
Canal Rajbuhas, would shew
the advantages and disadvantages
of different depts of excavation
[?] no [?] or earthen sloped
cattle Ghats are to be pemitted in
either the Rajbuhas or Feeders--
wherever lines of crossing are
required, the cross communication
will