105
Facsimile
Transcription
Office of the Light House Engineer
Thirteenth District
Portland, Oregon March 1, (1872)
Chairman Light House Board,
Washington, D.C.
Sir:
I have the honor to make the following Report of Operations for the month of February, 1872
Yaquina Light Station, Oregon.
Completed drawing of finished light house. Made Estimate for improvements.
Cape Foulweather Light Station Oregon
Removed a portion of the materials at Newport, so as to protect from salt water. Made drawing of reservation for surveyor
Probable Work in March
Preparations for Spring work. Surveying L H Reservation.
Cape Hancock Light Station, Wash. Ter.
Completed drawings of finished keeper's dwelling.
Cape Flattery Light Station, Wash Ter.
Excavated cistern to the depth of 3 ft below former bottom.
Probable Work in March.
Continue work on cistern. Transport materials if weather permits.