Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

4 revisions
dougreade at Mar 05, 2019 08:29 PM

123

connected with the transportation of materials. Since commencement of work in the Fall of 71 the lighters have (been) destroyed twice and the Schooner engaged in bringing materials from San Francisco had been obliged to discharge most of her freight at Newport, to be reshipped in milder weather. Vessel twice getting on the Bar, at the mouth of Yaquina Bay and once partially wrecked. Part of the materials have been hauled for Newport six miles over an almost impassible road to the L.H site. The metal work was completed at Portland, Oregon, June 1 1872. After the failure of persistent efforts to charter a vessel for carrying iron & Brick from Portland to the Cape, the metal work was shipped via San Francisco. About one half the time since the work began has been lost on account of the difficulties of transportation. The foundation of Tower has been laid, & work commenced on the Keeper's Dwelling, a double (2 story - crossed out) frame house. Both will probably be completed this season.
Point Adams (As or near Point Adams in the south side of the - crossed out) mouth of the Columbia River, Oregon.
The daily growing home & foreign Commerce of the Columbia & Willamette Valleys, demand that additional aids to navigation should be judiciously disposed about this important outlet to the Commerce of the northwest. An appropriation of $30,000 is

398

123

connected with the transportation of materials. Since commencement of work in the Fall of 71 the lighters have (been) destroyed twice and the Schooner engaged in bringing materials from San Francisco had been obliged to discharge most of her freight at Newport, to be reshipped in milder weather. Vessel twice getting on the Bar, at the mouth of Yaquina Bay and once partially wrecked. Part of the materials have been hauled for Newport six miles over an almost impassible road to the L.H site. The metal work was completed at Portland, Oregon, June 1 1872. After the failure of persistent efforts to charter a vessel for carrying iron & Brick from Portland to the Cape, the metal work was shipped via San Francisco. About one half the time since the work began has been lost on account of the difficulties of transportation. The foundation of Tower has been laid, & work commenced on the Keeper's Dwelling, a double (2 story - crossed out) frame house. Both will probably be completed this season.
Point Adams (As or near Point Adams in the south side of the - crossed out) mouth of the Columbia River, Oregon.
The daily growing home & foreign Commerce of the Columbia & Willamette Valleys, demand that additional aids to navigation should be judiciously disposed about this important outlet to the Commerce of the northwest. An appropriation of $30,000 is