524

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Needs Review

there were no other mishaps.
Civil engineers Street Chang
and Michael Lin with the aid
of mathimatician Ju Kwei Wang
then surveyed the lot. As
of the end of the Winter Quarter
the lot is in a worse condition
than before anything was done
to it.

4. I forgot to mention that David
Cochran married Miss Joyce
Gush at the Stanford Memorial
Church on the 18th of February.
The Club House Members plus
Williard Wing and Ernesto Yhap
donated $6 for the purchase
of an aluminum engraved
serving tray.

5. The Water Heater sprang a leak on the 6th
of Mach and became worse. The House
took bids on the 9th and the bids
ranged from $465 for a commercial
type heater to a low bid of $298.
We accepted the low bid of the
Palo Alto Plumbing Co of $298.
They came and installed the 100 gal
[Pheem?] heater on the 8th of March.
The heater has a 5 - 5 year [guarantee?]
warranty.

At the same time the plumber repaired the
Hot water faucet in the rear bathroom and checked
the first floor [furnace?].

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page