Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

5 revisions
caroleholmson at Dec 01, 2018 11:36 PM

120

Hoisted to thetop of the Island + carried to S.H. Site the B??? and balance of materials. ???aded around Cistern + for the Wood shed, Engine House. Completed House except inside work + painting. Emptied Cistern of water 10 or 12 times, the depth of water dipped out running from one to seven feet + the constant streams of water interfering materially, with the progress of the work. Comleted Brick work on cistern, excpet the floor. Erected Fog Signal apparatus + kept in operation nearly one week instructing the Light Keeper + one assistant in its management.
Probable Operations for June
Complete House, + paint it. Floor, Plastering, + Top of Cistern. Deliver 25 Tons of coal in Wood House, from Neah Bay. Make drawings of completed work. Inspect Light House.
Probable General Work for June-
Careful Inspection of the following Light Stations, with reference to improvements + repairs; Cape Flattery, Ediz Hook, New Dungeness, Smith's Island, + Admiralty Head.

Very respectfully,
Your obedient servant, 396
Henry M. Robert
Maj. of Eng'rs & L.H. Eng'r,
Thirteenth District.

120

Hoisted to thetop of the Island + carried to S.H. Site the B??? and balance of materials. ???aded around Cistern + for the ??? ??? Engine House. Completed House except inside work + painting. Emptied Cistern of water 10 or 12 times, the depth of water dipped out running from one to seven feet + the constant streams of water interfering materially, with the progress of the work. Comleted B??? work on the cistern, excpet the floor. Erected Fog Signal apparatus + kept in operation nearly one week instructing the Light Keeper + one assistant in its management.
Probable Operations for June
Complete House, + paint it. Floor, Plastering, + Top of Cistern. Deliver 25 tons of coal in Wood House, from Neah Bay. Make drawings of completed work. Inspect Light House.
Probable General Work for June-
Careful inspection of hte following Light Stations, with reference to improvements + reparis; Cape Flattery, Ediz Stook, New Dungeness, Smith's Island, + Admiralty Head.