Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

4 revisions
dougreade at Mar 05, 2019 06:59 AM

105

Office of the Light House Engineer
Thirteenth District
Portland, Oregon March 1, (1872)

Chairman Light House Board,
Washington, D.C.

Sir:

I have the honor to make the following Report of Operations for the month of February, 1872

Yaquina Light Station, Oregon.
Completed drawing of finished light house. Made Estimate for improvements.

Cape Foulweather Light Station Oregon
Removed a portion of the materials at Newport, so as to protect from salt water. Made drawing of reservation for surveyor

Probable Work in March
Preparations for Spring work. Surveying L H Reservation.

Cape Hancock Light Station, Wash. Ter.
Completed drawings of finished keeper's dwelling.

Cape Flattery Light Station, Wash Ter.
Excavated cistern to the depth of 3 ft below former bottom.

Probable Work in March.
Continue work on cistern. Transport materials if weather permits.

over 375

105

Office of the Light House Engineer
Thirteenth District
Portland, Oregon March 1, ???

Chairman Light House Board,
Washington, D.C.

Sir:

I have the honor to make the following Report of Operations for the month of February, 1872 Yaquina Light Station, Oregon.
Completed drawing of finished light house. Made Estimates for improvements.

Cape Foulweather Light Station Oregon
Removed a portion of the materials at Newport, so as to protect from salt water. Made drawing of reservation for surveyor

Probable Work in March
Preparations for Spring work. Surveying L H Reservation.

Cape Hancock Light Station, Wash. Ter.
Completed drawings of finished keeper's dwelling.

Cape Flattery Light Station, Wash Ter.
Excavated cistern to the depth of 3 ft below former bottom.

Probable Work in March.
Continue work on cistern. Transport materials if weather permits.